On Friday, Dec. 4, the Oswego Fire Protection District's lighted emergency vehicle parade will roll down Main Street to close out the Village's Christmas Walk. That night also includes the annual tree lighting, live ice sculpting, an inflatable sled hill and Santa's reindeer. The same street includes 121 S. Main St., where the former Dairy Barn is being turned into a breakfast and lunch restaurant. Nearby at 5 S. Madison St., a vacant building is getting a full buildout to become a wood-fired pizza place.
The holiday calendar this year is set, and it runs on downtown as it stands today. Almost every announced opening, plus the rebuild of South Harrison Street, targets the end of 2026 or later. Most of the new downtown is scheduled to show up after the last holiday event of the season.
The Oswego Downtown Association's 2026 holiday schedule runs from Thursday, Nov. 5, through Saturday, Dec. 12, so roughly five weeks.
| Date | Event | Details |
|---|---|---|
| Thu., Nov. 5 to Sun., Nov. 8 | Holiday Open Houses | Downtown stores open in their holiday décor |
| Sat., Nov. 7 | Coffee/Cocoa Crawl | 10 a.m. to 2 p.m., ticketed |
| Tue., Nov. 24 | Cookie Walk tins go on sale | 10 a.m., online only |
| Fri., Nov. 27 and Sat., Nov. 28 | Black Friday/Shop Small Saturday | Shop Small Season promotion |
| Fri., Dec. 4 | Christmas Walk | 4:30 to 8:30 p.m., rain or shine |
| Sat., Dec. 5 | Cookie Walk | 10 a.m. to 2 p.m., this year's tin required |
| Sat., Dec. 5 | Oswegoland Park District Holiday Market | 9 a.m. to noon, Little White School Museum |
| Sat., Dec. 12 | Jingle Bell Jog | 9 a.m., untimed, with Santa, cocoa and cookies after |
Dec. 5 is the busiest day. The Holiday Market at the Little White School Museum ends at noon, and the Cookie Walk runs until 2 p.m., so you can do both in one morning. You can't do the Cookie Walk without a tin, and tins go on sale online at 10 a.m. on Nov. 24, the Tuesday before Thanksgiving. The Jingle Bell Jog has no timing and no awards. Every runner gets a long-sleeve shirt and jingle bells, and the Downtown Association suggests staying downtown for lunch and gift shopping afterward.
During the Christmas Walk, the Village says downtown stores will open their doors so people can browse holiday décor and shop for gifts. Those are the stores open right now. Among recent additions, the Village lists Nash Vegas Saloon, which opened in a former 6,200-square-foot brewery space in July 2024; Paws on Main, which opened in March 2024; and American-Male, which opened at 27 Main St. in June 2025.
The Village's downtown business page lists what's coming next, and the target dates bunch up at the end of the year.
| Business | Address | What it will be | Stated target |
|---|---|---|---|
| Wholey Granoly | 121 S. Main St., former Dairy Barn | Breakfast and lunch, with the outdoor patio being enclosed | End of fall 2026 |
| Billy Bricks Wood Fired Pizza | 5 S. Madison St. | Wood-fired pizza, pasta, sandwiches, salads, ice cream | End of 2026 |
| Ellwood Steak & Fish House | 180 W. Washington St., in The Reserve at Hudson Crossing building | Full-service steak and seafood | End of 2026 or early 2027 |
| Harrison Street Square, phase one | 174 S. Harrison St. | Former industrial building converted to retail; TermiNader Fitness committed | End of 2026 |
These dates are targets, and each project was at a different stage when the Village posted them. Wholey Granoly had signed its lease and was getting ready to submit permit plans. Ellwood had submitted plans and was still in plan review before starting its buildout. Billy Bricks was already well into a major buildout. An "end of fall" opening for a restaurant that hadn't filed permits yet could slip easily. If one of these opens before the Christmas Walk, that's a bonus, and the event schedule doesn't depend on it.
Hell's BBQ is on a similar timeline. It's moving from 1019 Station Drive to 228 E. Washington St. In an October Shaw Local report, owner Keith Richards said he hoped to open by the end of the year. Economic Development Director Kevin Leighty described about $100,000 in planned building improvements, backed by a $40,000 Village incentive.
The block with the most change is Madison Street. Freddie's Off The Chain opened its restaurant at 11 S. Madison St. in April 2025 and closed it on July 21, 2026, as Shaw Local reported the day it closed.
About seven weeks later, Aurora food truck business DillaDawgs announced plans for a full-service restaurant in that space. Owner Taylor Trovato told Shaw Local in September that he was aiming for early October and described a patio that welcomes dogs. A few doors away, Billy Bricks is building out 5 S. Madison St.
So within about a year and a half, one short stretch of Madison will have gone from a vacant building and a new restaurant to two different new restaurants. When there's a gap between the end of a lease and the next opening, foot traffic from events like the Cocoa Crawl and Shop Small Saturday lands on whatever is open that week.
The largest project downtown has the longest schedule. On Aug. 18, 2026, the Oswego Village Board approved a $3,177,763.12 contract with H. Linden & Sons Sewer and Water for the Harrison Streetscape Improvement Project. Hoodline reported that the work covers about 800 feet of South Harrison Street south of Washington Street. It includes utilities, sidewalks, brick pavers, decorative lighting, landscaping, seating and signage.
At that August meeting, Village staff called it a 65-working-day contract and estimated construction would run from September 2026 to July 2027, according to the meeting record on Open Publica. Staff also explained what the street is meant to become. In their words, the project "improves a dilapidated roadway and transforms it into a safer and flourishing public corridor for pedestrians, businesses, and residents." The presentation listed community-specific identifiers, landscaping and plenty of seating to give the street a sense of place.
The same presentation said the project would help revive the riverfront south of Washington Street, called it the first step toward linking South Harrison to West Benton Street, and said it would give the Village a place to host special events. That last point is what connects Harrison Street to the holiday calendar. Today, events like the Christmas Walk use Main Street. The rebuilt Harrison corridor is being designed so future events can spread toward the river.
Harrison Street Square sits along that corridor at 174 S. Harrison St. It's planned as a redevelopment of a former industrial building with retail space, a food truck court and a central lawn. The Village says phase one, converting the building to retail, should be done by the end of 2026. The outdoor phase comes after that. Put the two timelines together and the earliest the street, the lawn and the food truck court could all be finished is mid-2027.
Away from downtown, a few openings are closer to the holidays. A Shaw Local report from Oct. 8 said Trader Joe's at 1930 U.S. Route 34, near Kendall Point Drive and Delta Sonic, was expected to open in early to mid-November. Leighty said the interior buildout would wrap up in October, followed by stocking.
Other projects follow the same pattern as downtown. The Village says Dutch Bros was approved near Route 34 and Ogden Falls Boulevard, with a grand opening targeted for late 2026 or early 2027. Construction has started on a 25,000-square-foot HomeGoods at Prairie Market East, between PetSmart and Aldi at U.S. 34 and Fifth Street. Shaw Local reported that it must get its occupancy permit by July 1, 2027. On Route 71, Bistro Manila, which serves Filipino food, is moving into 4542 Illinois Route 71, the former Asadoras Argentinas Burgers space. As of early October it had not announced an opening date.
The July 2027 date shows up on both sides of town. It's the HomeGoods permit deadline on Route 34 and the estimated end of construction on Harrison Street.
If you own near downtown and are wondering how new restaurants and a rebuilt Harrison Street could change what buyers notice about your block, Ryan Hill Group can go over the comparable sales on your street with you. Request a free home valuation whenever it suits you, and we'll keep tracking these openings into 2027.
Whether you’re ready to buy your next home or considering selling your current one, we’re here to help. Complete the form below, and a member of our team will be in touch shortly to answer your questions and help you take the next step.
Work with a team backed by 25+ years of local experience, proven results, and a genuine commitment to every client relationship.